Following is an overview of the review that was added:
Phase 3 is a 3 unit, 3 floor building that is the newest at the resort. The noise level from the units above is very high despite all the efforts made during construction of the building (I was there during that period). This building is a Friday check in while the other 2 older phases both have a Saturday check-in.
Please see the review here!
Please use this thread to discuss the review.
Phase 3 is a 3 unit, 3 floor building that is the newest at the resort. The noise level from the units above is very high despite all the efforts made during construction of the building (I was there during that period). This building is a Friday check in while the other 2 older phases both have a Saturday check-in.
Please see the review here!
Please use this thread to discuss the review.