    Prez John Chase has just issued the following update and construction link (mostly pictures of dirt so far, but that's every construction job's first step):

    "After a long wait for the permits - two we are still waiting for - the
    construction has started on the recreation area.

    Cypress Pointe

    The gazebo was temporarily pulled from the plans to allow for more
    detailed construction drawings as it is considered to be a structure.
    The hope is to obtain the permit required during the construction and
    complete it near the end of the 14 week period. At worst, the recreation
    area will be completed without it and it will be installed later.

    Also temporarily on hold are the gas grills as they too require special
    permitting. The engineers feel the best approach is to complete the
    basic construction with the proper piping/facilities for the grills then
    apply for the permits required. If the current plan included those two
    deleted items the permitting may not have been granted until this
    summer. Neither installation will have much impact on the new area even
    if done after the major project is already complete."

    That's all for now; stay tuned for further progress photos.