The roundabout on Hwy 179 near the Ridge Resort (near the Hilton in Village of Oak Creek) is nearly completed, and the one just north of it, at Jacks Canyon Rd. is also close to completion.
The ADOT crews have been working at night on these. Night driving thru the area continues to be a little challenging, but manageable if you drive slowly and keep alert.
The roundabout at Back o Beyond is a bit dark at night, and some folks feel they come upon it rather suddenly, but if you pay attention to the signs, you should be aware of it in plenty of time. That roundabout is north of the Village and just inside the Sedona city limits. It is about a mile south of the turn for Chapel of the Holy Cross.
The new road--section of Hwy 179 newly built--, which will be the Southern bifurcated road-- is nearly paved and will be used when they close off the existing road of Hwy 179 between the Village and Back o Beyond. This new road will be used for both directions of traffic until they realign and repave the old road, which then will be the northern part of Hwy 179 when the job is completed.
Phase II, between Back o Beyond and the Y in Sedona is not in full swing, but there have been some night closures to dig or prepare for utilities.
The road around Hillside shops is awfully bumpy from all the tearing up, and the stretch between Hillside and the Hyatt also has had some work and rework.
The ADOT crews have been working at night on these. Night driving thru the area continues to be a little challenging, but manageable if you drive slowly and keep alert.
The roundabout at Back o Beyond is a bit dark at night, and some folks feel they come upon it rather suddenly, but if you pay attention to the signs, you should be aware of it in plenty of time. That roundabout is north of the Village and just inside the Sedona city limits. It is about a mile south of the turn for Chapel of the Holy Cross.
The new road--section of Hwy 179 newly built--, which will be the Southern bifurcated road-- is nearly paved and will be used when they close off the existing road of Hwy 179 between the Village and Back o Beyond. This new road will be used for both directions of traffic until they realign and repave the old road, which then will be the northern part of Hwy 179 when the job is completed.
Phase II, between Back o Beyond and the Y in Sedona is not in full swing, but there have been some night closures to dig or prepare for utilities.
The road around Hillside shops is awfully bumpy from all the tearing up, and the stretch between Hillside and the Hyatt also has had some work and rework.