Originally posted by vintner
I would say the system is overloaded now, and by reducing the organic load to the leach field the system will rebalance in a state that does provide acceptable operation.
Again, this is all predicated on the assumption that the system is overloaded with waste, but would operate acceptably hydraulically save for the slime buildup.
Comment